PCMS   MISTRAS NDT Services
 
PCMS Modules
   Thickness
   SRV
   INSPECT2
   SAP
 Module Add-ons
  Ad Hoc Reporting
  Security
  DBF Import / Export
  Audit Trail
  E-mail Reporting
  Document Mangement
PCMS > Thickness > Thickness for Equipment Module
.Add Level 3 Calculation

The PCMS Thickness for Piping module includes Level 0 (Maximum interval) and Level 1 (Half Life Calculations) Calculations of next inspection date. It additionally includes retirement date calculation, temperature correction and fixed format reports. For advanced analysis and predictability Level 2 Calculation Module provides the next inspection dates based upon circuit analysis, with the Level 3 Calculation Modules providing the next inspection dates based upon risk analysis.

Sitemap | Contact Us
Copyright © 2002-2009 PCMS - MISTRAS Services, MISTRAS Group, Inc. All Rights Reserved.